Come winter, the geothermal floor began to hot up, even the not so cold in the south also introduced to warm, warm floors installed seen more and more important. Geothermal floor installation needs attention? Before installing,Minimal Maintenance outdoor flooring 1, ground handling before installation must be treated carefully, while leveling the ground according to standard specifications.
2, should be verified before laying the heating system is functioning properly, and the floor is completely dry, the moisture content of not more than 10%. 3, before the floor installation should be carried out step by step increase or decrease based on the room temperature, the room temperature gradually to a suitable installation of 15 ℃ -21 ℃. 4, to ensure that the heating system leads to the concrete floor temperature does not exceed 55 ℃. Installation: 1, the ground under the pad overlay 0.2 mm thick heat proof film, and the film seams should overlap 200 mm, and sealed tightly with tape. 2, fast heat conduction,Not split outdoor balcony flooring deformation, environmentally friendly geothermal dedicated floor mats; electric heating mats should also aging resistance, electrical insulation. 3, preferably floating installation, so that the floor close to the ground through the bedding material.
Also proposed laying of the floor along the direction of light. 4, floor geothermal heating system, is prohibited on the ground kicking chisel, nails, holes and so on. .1 After installation, after the wood floor coverings, in use should ensure that the heating system, heating temperature uniformity, to avoid local regional surface temperature is too high, try to maintain a constant temperature surface. Preferably not exceeding 27 ℃. 2, initial use or prolonged use of geothermal system on or off again, the temperature 5 ℃ better each day and gradually increase or decrease prohibited sudden cold or hot. 3, Corrosion-resistant balcony railings the winter heating season comes, check the connectors if there is leakage. 4, the indoor temperature is ≤40%, the measures should be taken humidification. 5, electric heating geothermal system found on the ground to take water drain, into the grass-roots non-use after floor heating system, or may endanger the safety of life. 6, it is recommended to put a doormat at the door, the floor surface to prevent direct access included in the room a lot of gravel caused by abnormal wear.
7, at the same time, best waterproof outdoor fence try to avoid home ground filled with water placed directly glassware and porcelain. In order to avoid uneven heating, resulting in rupture of the vessels, stealing. 8, to heat the floor surface should not put fixed decorative items, building sites should not add units, so as not to affect the hot air circulation.